Jackson |
Code of Ordinances |
Chapter 27. WATER AND SEWERS |
Article V. POST-CONSTRUCTION STORMWATER MANAGEMENT FOR NEW DEVELOPMENT AND REDEVELOPMENT |
Division 8. INSPECTIONS OF STORMWATER MANAGEMENT SYSTEMS |
§ 27-151. As-built certification and final inspection.
(a)
Within twenty (20) working days of the date of completion of construction of a stormwater management system (or discrete components thereof if the construction is phased), the permittee shall prepare and submit to the city engineer reproducible mylars and electronic files (in AutoCAD format) of the actual as-built plans for the system. The mylars shall be made of quality material and three (3) mils in thickness and shall otherwise be prepared at the same scale and level of detail as the approved final stormwater management plan.
(b)
The as-built plans shall show the final design specifications for the stormwater management system (and all discrete components thereof) and any deviations from the approved final stormwater management plan, and shall be accompanied by a written certification that the construction has been completed in full accordance with the approved final stormwater management plan. The as-built plans and written certification shall be signed and sealed by a professional civil engineer registered in the State of Michigan.
(c)
The city engineer shall conduct a final inspection of the stormwater management system. The stormwater management system must be approved by the city engineer before any performance guarantees may be released.
(Ord. No. 2011.01, § 1, 1-11-11)